Reading a lead report
Each evaluation is written up on CDPH Form 8552, with a diagram of where lead was found, the sampling method and the lab results. The inspector sends it to CDPH within 30 days and gives it to whoever ordered the work. Before a remodel, ask which components tested positive and which tested negative, then give the list to every trade that will cut, sand or demolish.
Testing before you buy or rent out
Federal rules give a buyer of a pre-1978 home a 10-day period to test, and the buyer and seller can shorten or lengthen it by mutual agreement. CDPH adds that in California the test is to be carried out by a certified Inspector/Assessor. A rental that a certified inspector finds free of lead-based paint is exempt from the disclosure rule, which makes a clean report valuable for an apartment owner.
What affects the cost
Pricing an inspection starts from counts: components to test, building size, units. Add dust and soil samples and lab fees for a risk assessment, and a separate visit for clearance. Sale deadlines, rush reports and tenants to schedule around change the plan.
If the report flags siding or trim, exterior lead paint removal is next; woodwork or plaster points to interior lead paint removal. Everything is listed on the homepage of Redwood City Lead Paint Removal.